Plant consists of 31 MW TGM Kanis and 5 MW BBC (Siemens) steam turbines.10.5 KV, 50 HZ, Boilers, DSC System, Plant Feeding System, Auxiliary equipment. Plant has been upgraded and modernized at extensive cost in the last three years. Included in the plant is an additional 14.3 MW BBC extraction condensing steam turbine and oil fired boiler that served as a back up plant. Complete plant is being sold at a fraction of the cost of the upgrades.
Hammad Akbar | Click here to see contact details in the message |
0 Reviews
Details:
Plant consists of 31 MW TGM Kanis and 5 MW BBC (Siemens) steam turbines.10.5 KV, 50 HZ, Boilers, DSC System, Plant Feeding System, Auxiliary equipment. Plant has been upgraded and modernized at extensive cost in the last three years. Included in the plant is an additional 14.3 MW BBC extraction condensing steam turbine and oil fired boiler that served as a back up plant. Complete plant is being sold at a fraction of the cost of the upgrades.
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X