72 MW Westinghouse 251 B11 Gas Turbine Power Plant
47 MW Westinghouse W251-B11 Gas Turbine with a brush electric generator, Year: 1998, 3000 rpm, 50 HZ, 11.5 KV, Fuel: Natural Gas, 25 MW Mitsubishi Steam Turbine, Year: 1999, Steam pressure: 86 bar/1260 psi, Boiler; Aalborg Keystone HP/LP System. Plant has been well maintained since new. Turbine is being offered overhauled by the manufacture with 0 hrs of runtime since overhaul.
Weili | Click here to see contact details in the message |
Hello, are you still looking for this product?
9 MW engine (with or without alternator) fueled with HFO.
Reduction gearbox for a W 251-B12 60 HZ they have a W251-B11 50 HZ. QUANTITY: 1 unit of each
APPLICATION OF PRODUCT Personnel
Usage
Dr Sydney Z Gata | Click here to see contact details in the message |
Please provide Information on Cost CIF Beira and whether supplier can do a Turnkey EPC Erection of the Plant.
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X