Ship type: Floating dock, Steel pontoon type
Class: KR
Built year: 2007, extend to 230m in 2011
Lifting capacity: 15000T
Load-out capacity: Abt. 12,000tons (= 6000tons x 2)
(at sea level: above 1.8m at DL)
Dimensions
Length (Pontoon deck) 200m
Breadth (Outside Mold) 45m
Breadth (Inside Mold) 39m
Depth (Top deck) 19m
Depth(Safety deck) 15.5m
Depth (Tween deck) 12m
Depth (Pontoon deck at C.L) 6.5M
Draft (Max draft): abt 15.3m
Draft (Working draft): abt 6.0m
Draft(Light draft): abt 1.75m
Gross tonnage: 20900ton
Tank Capacity (100%)
Water ballast : abt 57,100m3
F.O storage tank abt 50m3
Ballast pump capacity
Pump capacity: 2,000m3/h x 15m x 110kw
No. Of set: 10 sets
Pumping time: (For Floating) abt 2.5 hours
(For Load-out0 abt 1.0 hour
Windlass:
Type: Electro-hydraulic motor driven (1-G.W + 1-W.E)
Capacity: 20/40 ton x 24/12m/min
Chain diameter: 66dia - G3
Brake holding power: Min. 151.65 ton (Manual type)
Warping drum: 30/15 ton x 9/18m / min
Operation: Machinery side
Number: 1 set
Chain pipe bellmouth to be supplied by Maker’s
Mooring winch
Type Electro-hydraulic motor driven (1-R.D+1-W.E)
With wire shifter
Capacity 15 / 30 ton x 16/8m / min
Wire rope diameter: 50 dia. 300m (drum rolling length)
Brake holding power: abt. 60ton (Manual type)
Warping drum: 30/15 ton x 6/12 m/min
Operation: Machinery side
Number: 7 sets
Anchoring and Mooring Equipment
Anchor Danforth type 13.60ton 1set
Anchor chain Grade 3 66dia x 412.5m 1 lot
Mooring rope Megaion rope 90 dia x 220m 8 roll
Wire rope for MW 50 dia (6xWS36 IWRC) X 300m 7 roll
Mooring bitt (double) top deck 450 dia 4 sets
Mooring bitt (double) pontoon deck 450 dia 6 sets
Cross bitt(double) top deck 450 dia 4 sets
Closed chock top deck 400mm 12 sets
Multi-roller (Universal roller) top deck S.W.L 60 ton 7 sets
Stand roller top deck S.W.L 60ton 4 sets
Chain compressor (Roller type) top deck for 66 dia, chain 1set
Anchor chain guide pontoon deck for 66 dia.chain 1 set
Anchor stopper top deck for 14 ton 1 sest
Note:
1. All mooring fittings capacity of more than S.W.L 60 ton
2. Steel const.Hawse & Chain pipe to be provided
3. Steel pipe fabrication Anchor rest to be provided on starboard fore end side
4. Hawse pipe & chain pipe bellmouth to be fitted of each pipe end part.
Gantry Crane
One set of Gantry crane on top deck 30t
Electric motor 440V 60HZ
Towing Equipment
The tug pieces is equipped at the suitable place of working deck ship bow and stern. And the hull is reinforced at their location.
Delivery: October, 2015
More photos, Class Survey Report, latest Inspection report , G.A available for named serious buyer.
Can guide a price