Subject: 2 sets of 200MW steam turbine generators( 50/60Hz) for sale


Date: 24.7.2017 14:45:00

Details: Reviews 0

2 sets of 200MW steam turbine generators( 50/60Hz) for sale

Dear Sirs

We have following stream turbines for sale

 

200 MW x 2 Steam Turbine generators(50/60HZ)

PRICE IS USD3.5 million as is where is

(Operation hours and efficiency)

#2: 180,004 hours/34.46%

#3: 180,096 hours/34.73%

 

(Turbines)

Capacity:200MW

Make: Siemens

Year:1971 /1973

Max.Continuos Generation Capacity:275,000kWh

Type: Re-heat, Recycle, Condensing

Main steam temperature:535

Main steam pressure:191kg/cm2

Reheating steam temperature:442

Rehating steam pressure:538kg/cm2

Baxk pressure:46.09mbar

Extraction steps:7 steps

Turbine steps(HP/IP/LP):70steps(19/18/11x3)

Critical speed:1410,1920,2450,2520,2570,3260RPM

RPM:3600

Condenser:

-Siemens, year1971

-Box type, Surface condenser

 

(Generators)

Capacity:275MVA

Make: Siemens

Year:1971/1973

Model: FTHDD 540/60,Hydrogen cooling

Capacity:275MVA

Voltage:21,000 plus/minus 7.5%V

Current:7560A

HZ(Power factor):60(0.8)

Phase:3

Generator volume:53m3

Hydrogen gas pressure:4kg/cm2

RPM:3600

Excitation:

-Siemens, year1971/1973

-Condenser:

-Siemens, year1971/1973

-Box type, Surface condenser

-Steam:385.59m3/h

 

(Exciter)

Make: Siemens

Year:1971/1973

Type:Indirect exciting type

Capacity;1810kVA

Voltage:400V

Current:2600A

Frequency:180Hz

RPM:3600

Phase:3

 

 

 

(Main transformers)

1)Make: Hyundai(Korea),year1997

-Voltage ratio:164,000V/21,000V

-Capacity:260MVA

2)Make: Siemens,Year1971

-Voltage ratio:164,000V/21,000V

-Capacity:260MVA

3)Make: Siemens, year:1971

-Voltage ratio:164,000V/21,000V

-Capacity:260MVA

(Start Transformer)

-Quantity:2

-Make: Siemens, year1970

-Make: Hyundai, year1999

 

(Control systems)

Turbine Control System:

-Make: ABB, year1991

Automatic Boiler Control System:

-Make:ABB, year1991

Data Acquisition System:

-Make: ABB, year1990

Sequence of Event Recoder(SOE)

-Make: Rochester Instrument System(Germany),year1999

Operator Interface Systen Unit(OIS)

-Make: ABB, year2012/2005

 

 

 

(Main Equipment change History:2006~2012)

 

2012: Middle pressure turbine control valves changed

into new ones /Turbine control drive changed

2008: HP TBN Assembly of #3 High pressure turbine

2008: Control valve all changed into brand-new ones

of #3 Middle pressure turbine

2008: Coupling bolts all changed into brand-new ones of #3 turbine

2008: Fixed wings all changed into brand-new ones of #3 Low pressure turbine

2008: Exciter wheel units changed into brand-new ones

2008: Turbine main oil pump shaft changed into brand-new ones

2007: Blades 22 units changed into brand-new ones of #2 Middle pressure turbine

2007: Crossed key 14 units changed into brand-new ones of #2 Middle pressure turbine

2007: Locking strip changed into brand-new ones of #2 Middle pressure turbine

2007: IP TBN rotor blade 402 units changed into brand-new ones of #3 Middle pressure turbine

2006: HP TBN Assembly of #2 High pressure turbine

2006: Control valve change of #2 Middle pressure turbine

Details will follow on request

please advise your interest

Best regards

Woon H Jee

 

INSOL Limited

Korea

101-802 , Bundangro 190

Seongnam city, Kyonggido

13581, Korea

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X