Dear Sirs
We have following stream turbines for sale
200 MW x 2 Steam Turbine generators(50/60HZ)
PRICE IS USD3.5 million as is where is
(Operation hours and efficiency)
#2: 180,004 hours/34.46%
#3: 180,096 hours/34.73%
(Turbines)
Capacity:200MW
Make: Siemens
Year:1971 /1973
Max.Continuos Generation Capacity:275,000kWh
Type: Re-heat, Recycle, Condensing
Main steam temperature:535
Main steam pressure:191kg/cm2
Reheating steam temperature:442
Rehating steam pressure:538kg/cm2
Baxk pressure:46.09mbar
Extraction steps:7 steps
Turbine steps(HP/IP/LP):70steps(19/18/11x3)
Critical speed:1410,1920,2450,2520,2570,3260RPM
RPM:3600
Condenser:
-Siemens, year1971
-Box type, Surface condenser
(Generators)
Capacity:275MVA
Make: Siemens
Year:1971/1973
Model: FTHDD 540/60,Hydrogen cooling
Capacity:275MVA
Voltage:21,000 plus/minus 7.5%V
Current:7560A
HZ(Power factor):60(0.8)
Phase:3
Generator volume:53m3
Hydrogen gas pressure:4kg/cm2
RPM:3600
Excitation:
-Siemens, year1971/1973
-Condenser:
-Siemens, year1971/1973
-Box type, Surface condenser
-Steam:385.59m3/h
(Exciter)
Make: Siemens
Year:1971/1973
Type:Indirect exciting type
Capacity;1810kVA
Voltage:400V
Current:2600A
Frequency:180Hz
RPM:3600
Phase:3
(Main transformers)
1)Make: Hyundai(Korea),year1997
-Voltage ratio:164,000V/21,000V
-Capacity:260MVA
2)Make: Siemens,Year1971
-Voltage ratio:164,000V/21,000V
-Capacity:260MVA
3)Make: Siemens, year:1971
-Voltage ratio:164,000V/21,000V
-Capacity:260MVA
(Start Transformer)
-Quantity:2
-Make: Siemens, year1970
-Make: Hyundai, year1999
(Control systems)
Turbine Control System:
-Make: ABB, year1991
Automatic Boiler Control System:
-Make:ABB, year1991
Data Acquisition System:
-Make: ABB, year1990
Sequence of Event Recoder(SOE)
-Make: Rochester Instrument System(Germany),year1999
Operator Interface Systen Unit(OIS)
-Make: ABB, year2012/2005
(Main Equipment change History:2006~2012)
2012: Middle pressure turbine control valves changed
into new ones /Turbine control drive changed
2008: HP TBN Assembly of #3 High pressure turbine
2008: Control valve all changed into brand-new ones
of #3 Middle pressure turbine
2008: Coupling bolts all changed into brand-new ones of #3 turbine
2008: Fixed wings all changed into brand-new ones of #3 Low pressure turbine
2008: Exciter wheel units changed into brand-new ones
2008: Turbine main oil pump shaft changed into brand-new ones
2007: Blades 22 units changed into brand-new ones of #2 Middle pressure turbine
2007: Crossed key 14 units changed into brand-new ones of #2 Middle pressure turbine
2007: Locking strip changed into brand-new ones of #2 Middle pressure turbine
2007: IP TBN rotor blade 402 units changed into brand-new ones of #3 Middle pressure turbine
2006: HP TBN Assembly of #2 High pressure turbine
2006: Control valve change of #2 Middle pressure turbine
Details will follow on request
please advise your interest
Best regards
Woon H Jee
INSOL Limited
Korea
101-802 , Bundangro 190
Seongnam city, Kyonggido
13581, Korea
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X