Subject: 8 sets J620GS-F75 (3814KW 10.5KV 50HZ) gas generator set


Date: 8/26/2024 6:28:37 AM

Details: Reviews 2

1.1 Generator set manufacturing date (see photo) -2019

1.2 Operation time of the power station --2020

1.3 Power station composition includes:

1.3.1 Generator set (including unit body, +M control cabinet, +A control cabinet, GAS train)

1.3.2 Power Station supporting (including: Generator set, internal and air conditioning system, air

intake and exhaust system, external cooling water system and domestic water unit, external

silencer, external exhaust GAS boiler and SCR, gas compressor station and air compressor unit, steam turbine unit and lithium bromide equipment, domestic supporting electrical control box). 2 Quality status:

Electrical equipment and unit electrical components through long-term electric heating

maintenance, mechanical parts regularly crankshaft turning (start pre-supply oil pump)

2.1 generator set:

2.1.1 J620 gas engine

The engine and generator are jointly arranged on the same common base, the production date is

2019, and the operation time is about 4000 hours after the factory, and the appearance is good

(because the unit is arranged in the machine room). The components are complete. 2.1.2 leroy-somer generator

Because the automatic electrical heating maintenance, in good condition, the main components

are complete. 2.1.3 +M2 Control cabinet

It is installed on a common base and has complete internal components. 2.1.4 +A Control Cabinet

Arranged in the centralized control room of the equipment room, long-term power, good

condition, complete components. 2.1.5 GAS train

The original parts of the device, such as: check valve, solenoid valve, flow detector, pressure

sensor, etc. All are in good condition in the machine room. 2.2 Power Station supporting:

2.2.1 Cooling water system

External low temperature and high temperature air cooled coolers are arranged on the roof of

the equipment room, and the pipelines are respectively connected to the J620 unit through the

pumping station. 2.2.2 Silencer

Arranged in the silencer room of the equipment room, the smoke exhaust pipe first enters the

silencer, and then connects to the intake pipe of the external waste steam boiler through the

external wall. 2.2.3 External exhaust gas boiler and SCR: (8TON/ hour)

Arranged outside the machine room, with SCR purification system, divided into No. 1 and No. 2,

through the electronic control valve and three-way pipeline and smoke exhaust pipe and silencer

connected, step ladder directly. 2.2.4 The GAS compressor station and the air compressor unit are arranged in the oil storage

room in the equipment room and are in good condition. 2.2.5 Steam turbine units and lithium bromide equipment

Configuration yes, not examined in detail

2.2.6 Domestic supporting electrical cabinet

The devices are arranged in the equipment room, including: in the equipment room control room

and remote control room (1st floor of the office building).

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Gabrielle Niu
9/12/2024 6:25:13 AM China

hi,we don't have this spurce now,if you can accept Chinese brand gas gen set,please add my whatsapp 86 186 3046 0723

Reply
ALireza Valadkhani
8/29/2024 7:40:40 PM Iran, Islamic Republic of

Our company as one of the leading company as EPC power plant and gas generator supplier in our market , We are interested in your whole set of Jenbacher generators , would you please let me know the asking price and sale condition if still are available.

regards

Alireza Valadkhani

Reply

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X