Year of construction 1994
Last major overhaul at 2004, actual hours of turbines 8400 – 9300 h
The Power plant main components are the followings:
- 4 units gas turbines FIAT TG50D5 with capacity of 123 MW
- 4 units recovery generators - two pressure levels
- 2 units steam turbines - opposite flow, each 110 MW
- 2 surface condensers - cross flow
- 2 cooling towers - dry and natural draft
- 6 synchronous generators, three-phase, rated power 140 MVA each.