Subject: CSSC 500KW 1000KW natural gas gen set for cogeneration gas power plant


Date: 9/10/2024 11:41:47 AM

Details: Reviews 0

12V500GS and 12V1000GS Gas gen set supply scope Basic scope of supply 1) Gas engine 2) Generator 3) ECC (Engine Control Cabinet) 4) GCC (Genset Control Cabinet) 5) Gas pressure regulating valve group (filter, double solenoid valve , pressure regulating valve, pressure gauge, pressure switch) 5) High temperature cooling water pump, intercooler cooling water pump 6) Cooling system three-way valve (discrete supply) 7) Wiring harness (between each sensor, actuator and ECC cabinet) 8) Air filter, oil filter, spark plug, etc. 9) Factory testing and on-site debugging Optional scope of delivery 1) Special tools 2) 8000 hours of spare parts 3) Modular integration

 

 

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X