FOR SALE
Frame 6B gas turbine PG 6561B, LEC upgraded one, converted in 2009 from Syngas to LEC natural gas combustion system
Year of construction 1996,
operating hours 83421, overhaul 2009, since 3400 hours at 330 starts,
shutdown 2012
This power plant will be overhauled before deilivery
Currently partially disassembled, cleaned and checked for defects
GT transmission, BHSAD 66 USO
Generator Alstom T 214-234
GT controller system (Mark V)
Co2 fire extinguishing system of the gas turbine
Heat recovery steam generator, standard boiler Duisburg 4x4 sygas-fired additional burner
Main steam turbine, double extraction - contensation turbine
ABB Turbine Nürnberg GmbH, type VEE 40
Boiler feed water pumps 1 and 2 Sulzer Pumps Germany
Contensation steam turbine SST 060, Siemens Turbomachinery
Cooling water pumps 1 and 2 and 3 KSB AG Dt.,
Cell cooling turbine 1 and 2, GEA Energietechnik GmbH
Full desalination plant 2.9 sqm, Hager and Elsässer GmbH
this also includes:
Housing gas turbine generator set with filter house
Gas turbine machine transformer 10/30 KV; 55 MVA, Pouwels
Heat recovery steam generator with gas turbine - flue gas duct and chimney
Machine house - steel structure, isopanels
Steam turbine machine transformer 10/30 KV; 37.5 MVA
both cell coolers
Gas reducing station - without the building itself
Double girder overhead traveling crane 25 to. and 6.3 tons,
Elevator boiler house 500 ZPP, GEDA -
During the conversion of the GUD to natural gas, the following work was carried out on the main units
Gas turbine
Hot gas path inspection
Exchange of the 10 transition pieces
Exchange of the 10 burners with Wueruündrphren
Exchange of the guide u, blades of all 3 stages
Installation of a LO Nox system
Adaptation of the control to the new driving style (software change)
Transmission revision
Refilling the turbine oil
In 2010 a 3-stage air filter was installed
Gas turbine generator
pull large revision with inductor
Insulation measurements
The conversion of the GT was carried out by Ansaldo Thomassen.
Steam turbine
open the turbine
Bring runners to the factory, material tests, blasting, sheet metal, balancing
Reseal parting joint
Close withdrawals that are no longer required
Realignment of the runner
Renewal of sealing steam control
New turbine control and adaptation to the steam turbine generator control system
The same work was carried out on the generator as on the GT generator.
The revision work was carried out by Turbomaschinen (TMS).
Waste heat boiler
The AHK received a water pressure test
Comprehensive material tests were carried out
All TÜV-relevant tests including the associated containers and pipelines
The necessary documentation is available for all work carried out, from which further details can be found.
All specialist companies involved in the general overhaul and technical renewal can confirm that the power plant complies with current technical requirements, including environmental requirements.
Dismantling and rebuilding can be offered separately by us.
The price is 4.1 million EURO as is where is.
Please advise your interest
Best regards
INSOL Corporation
Korea
101-802 , Bundangro 190
Seongnam city, Kyonggido
13581, Korea
The General Electric 77MW CCGT (50HZ) Frame 6B Gas Turbine is a combined cycle gas turbine (CCGT) power plant that utilizes the GE Frame 6B gas turbine, model PG 6561B, which has been upgraded and converted from Syngas to LEC natural gas combustion system in 2009. Constructed in 1996, the power plant has a total of 83,421 operating hours, with an overhaul in 2009 and has been shut down since 2012. It is currently partially disassembled, cleaned, and checked for defects. The power plant will undergo an overhaul before delivery.
The power plant features various components and systems, including:
Additional infrastructure and equipment include housing for the gas turbine generator set, machine transformers, heat recovery steam generator, gas turbine-flue gas duct and chimney, machine house steel structure, cell coolers, gas reducing station, overhead traveling cranes, and more.
During the conversion to natural gas, various maintenance and upgrade works were carried out on the main units, including gas turbine hot gas path inspection, transmission revision, air filter installation, generator revision, steam turbine refurbishment, waste heat boiler pressure test, and material tests. All the necessary documentation for the work carried out is available, and the power plant complies with current technical and environmental requirements.
Dismantling and rebuilding services can be offered separately.
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X