YEAR: 2014
GE TM2500+ GEN 6 DUAL FUEL TURBINE
2,000 TO 4,000 HOURS USED FOR STANDBY POWER.
A PERFECT ASSET FOR CRYPTO MINING, DATA CENTERS, OR EMERGENCY POWER.
FUEL: NATURAL GAS & DIESEL.
25 MW RUNNING ON 50Hz
30 MW RUNNING ON 60Hz.
READY TO SHIP
TM2500+ MOBILE GAS TURBINE PACKAGE
I. ONE (1) UNUSED X TM2500+ MOBILE DUAL FUEL 50/60Hz. GAS TURBINE GENERATOR PACKAGES
ARE OFFERING ONE (1) UNUSED X TM2500+ MOBILE DUAL FUEL 50/60Hz. GAS TURBINE GENERATOR PACKAGE AVAILABLE FOR IMMEDIATE SALE AS A RESULT OF A CANCELLED OFFSHORE SOUTH AMERICAN PROJECT, AND WHICH ARE UNUSED, TESTED AND STORED IN LINE WITH OEM INSTRUCTIONS.
ENGINEERING, INSTALLATION AND COMMISSIONING SERVICES, TOOLING, SPARE PARTS, LTSA ETC. ARE AVAILABLE UNDER SEPARATE CONTRACT. THE CONDITION OF ALL EQUIPMENT SHOULD BE CONSIDERED UNUSED SURPLUS, AND TESTED, WITH ALL LATEST CONTROLS AND AUXILIARY SYSTEMS. ALL GE TEST REPORTS AND CERTIFICATIONS WILL BE MADE AVAILABLE TO QUALIFIED CUSTOMER. ALL UNITS MANUFACTURED IN 2014. OWNER WILL SCHEDULE A PHYSICAL INSPECTION AT THE CLIENT’S CONVENIENCE. ALL UNITS ARE MANUFACTURED WITH DUAL FREQUENCY AND VOLTAGE OUTPUT BASED ON 50 OR 60 CYCLE APPLICATION. OWNER WILL REQUIRE 4 WEEKS TO READY UNITS FOR SHIPPING AND TO SET FREQUENCIES AND SYNCHRONIZE VOLTAGES. IN MOST CIRCUMSTANCES, BARRING UNFORESEEN MODIFICATIONS REQUIRED, THIS GAS TURBINE PACKAGE CAN BE READY TO SHIP WITHIN 4 WEEKS AND ONLY AFTER FULL PAYMENT. THIS IS A CASH ONLY TRANSACTION WITH FLEXIBILITY NEGOTIATING THE SCHEDULE OF PAYMENT MILESTONES. LETTERS OF CREDIT ARE NOT ACCEPTED FOR THIS PURCHASE AS PACKAGES ARE IN STORAGE, FULLY MANUFACTURED AND REMAIN UNDER OEM WARRANTY. OWNER WILL FACILITATE ALL ASPECTS OF THE PURCHASE SALE TRANSACTION CONVEYING CLEAR TITLE AND REASSIGNMENT OF ALL REMAINING WARRANTIES AND ENTITLEMENTS ATTACHED TO THESE ASSETS.
TECHNICAL DATA
60Hz | 50Hz | |||
WATER INJECTION (NOX= 25 PPMVD@15% O2) | NONE | YES | NONE | YES |
OUTPUT (MW) | 30.688 | 30.988 | 26.190 | 26.190 |
HEAT RATE (BTU/KWH) | 8,830 | 9,285 | 9,246 | 9,705 |
HEAT RATE (KJ/KWH) | 9,316 | 9,796 | 9,755 | 10,239 |
EFFICIENCY (%) | 39 | 37 | 37 | 35 |
PRESSURE RATIO | 22.5 | 22.8 | 21.2 | 21.3 |
POWER TURBINE SPEED (RPM) | 3,600 | 3,600 | 3,000 | 3,000 |
EXHAUST FLOW (IB/SEC) | 192.2 | 196.6 | 184.5 | 187.2 |
EXHAUST FLOW (KG/SEC) | 87.2 | 89.2 | 83.7 | 84.9 |
EXHAUST TEMP (F) | 959.1 | 906 | 925 | 879 |
EXHAUST TEMP (C) | 515 | 485.6 | 496.1 | 470.6 |
60 Hz BASED ON A BRUSH AIR-COOLED GENERATOR W/ BRUSHLESS EXCITATION @0.90 PF, 59°F COOLING AIR. 13.8 KV (50 Hz@ 11.5 KV), AMBIENT AIR: 59°F, 60% RH, SEA LEVEL
TECHNOLOGY OVERVIEW
KEY HIGHLIGHTS:
-EQUIPPED WITH LM2500+ AERODERIVATIVE GT
-PROVEN TECHNOLOGY, OVER 42 MILLION OPERATIONAL HOURS
-23 TO 31 MW ON WHEELS
-37% SC EFFICIENCY
-DUAL FREQUENCY - 50 OR 60 Hz OPERATION
-LIQUID (#2 DIESEL AND JET FUEL) AND/OR GAS FUEL (NATURAL GAS AND COG)
-AMBIENT TEMPERATURE OPERATIONAL RANGE FROM - 39°C TO 50°C
-INSTALLATION IN DAYS
-GLOBAL AVAILABILITY
-TURNKEY SOLUTIONS INCLUDING O&M
-FAST START - ZERO TO 100% IN 10 MINUTES
-MODULAR MECHANICAL AND ELECTRICAL BOP
-REMOTE MONITORING & DIAGNOSTICS - AVAILABLE
ONE (1) TM2500+ MOBILE GAS TURBINE GENERATOR SET
EACH TM2500+ CONSISTS OF TWO TRAILERS AND AUXILIARY EQUIPMENT DESCRIBED BELOW. THE TRAILERS INCLUDE THE MAIN TRAILER AND AUXILIARY TRAILER. THE INLET AIRFILTER ASSEMBLY AND EXHAUST DUCT ASSEMBLY SHIP LOOSE AND ARE ASSEMBLED ONTO THE MAIN TRAILER DURING COMMISSIONING. IN ADDITION TO THE ABOVE, OWNER CAN ALSO SUPPLY AND SHIP VARIOUS SPARE PARTS AND TOOLS AS REQUIRED. THE TRAILERS AND AUXILIARY EQUIPMENT IS DESCRIBED IN MORE DETAIL BELOW. THE SCOPE OF SUPPLY INCLUDED WITH THE ONE (1) TURBINE PACKAGE IS DEFINED AND DESCRIBED AS FOLLOWS:
1.1 MAIN TRAILER
THE MAIN TRAILER CONSISTS OF THE FOLLOWING COMPONENTS OF A SEVEN-AXLE, AIR RIDE SUSPENSION TRAILER (3+4) AND A 3-AXLE JEEP ARE USED TO TRANSPORT THE MAIN TRAILER COMPONENTS. THE TRAILER AND JEEP COMBINATION IS APPROXIMATELY 108’ (32900mm) LONG (LESS TRACTOR) DURING TRANSPORT AND WEIGHS APPROXIMATELY 210,000 POUNDS (95,254 KG) FULLY LOADED. AT THE JOBSITE, THE JEEP AND TRAILER GOOSENECK ARE REMOVED AS WELL AS THE 3 REAR AXLES OF THE TRAILER. WITH THESE PIECES REMOVED, THE MAIN TRAILER IS APPROXIMATELY 68.25’ (20800mm) LONG DURING OPERATION, MEASURED FROM THE PLENUM ON ONE END TO THE FOOTING ON THE OTHER. TEN LANDING LEGS ARE PROVIDED TO SUPPORT AND LEVEL THE EQUIPMENT AT THE JOBSITE. APPROPRIATE SITE FOUNDATION IS NOT PART OF THE SCOPE OF SUPPLY.
GAS TURBINE
THE GAS TURBINE IS A GENERAL ELECTRIC LM2500 PKMDW MODEL ISO RATED FOR CONTINUOUS DUTY AND CONFIGURED FOR OPERATION ON EITHER NATURAL GAS OR LIQUID FUEL. EACH IS CONFIGURED FOR OPTIONAL WATER INJECTION FOR NOX REDUCTION, IF REQUIRED. ALTITUDE, HUMIDITY, AND INLET AND EXHAUST LOSSES WILL AFFECT POWER OUTPUT AND HEAT RATE. IN ADDITION TO THE INLET AIR FILTER, THE ENGINE IS EQUIPPED WITH A STAINLESS-STEEL MESH SCREEN IN THE INLET AIR STREAM FOR “LAST CHANCE” PROTECTION AGAINST FOREIGN OBJECT DAMAGE. THE ENGINE IS SHOCK MOUNTED FOR SHIPPING AND SHIPPED IN POSITION, WITH THE EXCEPTION OF THE COUPLING SPACER, WHICH IS INSTALLED DURING COMMISSIONING.
GENERATOR
THE GENERATOR IS AN AIR-COOLED, OPEN AIR, 2-POLE, 50/60 Hz, 0.85-.99 PF (LAGGING) CAPABLE BRUSH GENERATOR. THE GENERATOR INCLUDES A BRUSHLESS EXCITATION SYSTEM WITH PERMANENT MAGNET GENERATOR. NEUTRAL, LINE SIDE CUBICLES, MEDIUM VOLTAGE SWITCHGEAR ARE INCLUDED. THE GENERATOR IS HARD MOUNTED TO A BASE ON THE MAIN TRAILER AND INCLUDES GENERATOR AIR INLET FILTERING AND AIR SILENCING. THE GENERATOR IS OPERATED AT CLASS F TEMPERATURE RISE.
TURBINE ENCLOSURE
THE EQUIPMENT PACKAGE IS SUPPLIED WITH A WEATHERPROOF ACOUSTIC ENCLOSURE FOR THE GAS TURBINE. THE ENCLOSURE IS COMPLETELY ASSEMBLED AND MOUNTED OVER THE EQUIPMENT PRIOR TO TESTING AND SHIPMENT. PROVISIONS FOR TURBINE REMOVAL AND PERSONNEL ACCESS ARE INCLUDED. THE TURBINE COMPARTMENT IS FULLY VENTILATED BY 2 X 50% VENTILATION FANS (PROVIDED IN THE AIR FILTER).
FUEL SYSTEM
THE GAS TURBINE, AUXILIARY EQUIPMENT, AND CONTROLS ARE ALL CONFIGURED FOR GAS, LIQUID, OR DUAL FUEL OPERATION. THE TM2500+ IS SUPPLIED WITH A NATURAL GAS FUEL SYSTEM USING AN ELECTRONICALLY CONTROLLED FUEL-METERING VALVE. FOR FULL-LOAD OPERATION, THE GASEOUS FUEL MUST BE SUPPLIED TO THE AUXILIARY TRAILER SKID CONNECTION AT: 320 MMBTU/HR MAX; 180°F [82°C]; MAX; 520 +/- 20 PSIG (3,585 +/- 138 KPAG); AND FILTERED TO 5 OR LESS MICRONS. THE BUYER MUST PROVIDE GAS FUEL THAT IS CLEAN, FILTERED AND COMPLIANT WITH GENERAL ELECTRIC SPECIFICATION MID-TD-0000-1. THE PACKAGE IS ALSO EQUIPPED WITH A LIQUID FUEL SYSTEM. TYPICAL LIQUID FUELS INCLUDE DFL, DF2, OR JP4. FOR FULL-LOAD OPERATION, BUYER MUST SUPPLY LIQUID FUEL TO THE CONNECTION AT THE AUXILIARY TRAILER SKID AT 40 GPM (151.4 L/MIN], 30 ± 10 PSIG (207 ± 69 KPAG], FILTERED TO 5 MICRONS AND AT LEAST 20°F (11°C) ABOVE THE WAX POINT TEMPERATURE. THE BUYER MUST PROVIDE LIQUID FUEL THAT IS CLEAN, FILTERED AND COMPLIANT WITH GENERAL ELECTRIC SPECIFICATION MID TD-0000-2.
ALL NECESSARY SHUTOFF VALVES, FLOW METER, PIPING AND INSTRUMENTS BETWEEN THE AUXILIARY TRAILER SKID CONNECTION AND THE ENGINE ARE INCLUDED. BUYER MUST PROVIDE SUPPLY PIPING WITH SAMPLING PORTS, FUEL SYSTEM FILTRATION AND APPLICABLE SHUT-OFF VALVES AND CONTAINMENT PER LOCAL CODES AND STANDARDS.
WATER INJECTION SYSTEM
THE EQUIPMENT PACKAGE IS CAPABLE OF WATER INJECTION FOR NOX REDUCTION. FOR FULL-LOAD OPERATION, THE DEMINERALIZED WATER MUST BE SUPPLIED TO THE AUXILIARY TRAILER SKID CONNECTION AT 28 GPM (106 L/MIN], 15 PSIG (103 KPAG] MINIMUM, 40 TO 140°F (4 TO 60°C) FILTERED TO 10 MICRONS. THE BUYER MUST PROVIDE DEMINERALIZED WATER THAT IS CLEAN, FILTERED AND COMPLIANT WITH GENERAL ELECTRIC SPECIFICATION MID-TD-0000-3.
ALL NECESSARY SHUTOFF VALVES, FLOW METER, PIPING AND INSTRUMENTS BETWEEN THE AUXILIARY TRAILER SKID CONNECTION AND THE ENGINE ARE INCLUDED. BUYER MUST PROVIDE SUPPLY PIPING WITH SAMPLING PORTS, FUEL SYSTEM FILTRATION AND APPLICABLE SHUT-OFF VALVES AND CONTAINMENT PER LOCAL CODES AND STANDARDS.
LUBE OIL SYSTEMS
THE EQUIPMENT PACKAGE IS SUPPLIED WITH TWO SEPARATE LUBE OIL SYSTEMS; ONE FOR THE GAS TURBINE AND ONE FOR THE GENERATOR. THE OIL RESERVOIRS AND PIPING ARE ALL STAINLESS STEEL, AND THE LUBE OIL SYSTEM VALVES HAVE STAINLESS STEEL TRIM. EACH LUBE OIL SYSTEM HAS A PUMP, SIMPLEX FILTERS, NECESSARY VALVES AND INSTRUMENTATION, AND THERMOSTATIC CONTROLLED ELECTRIC HEATERS. A DUAL FAN, SINGLE CORE FIN FAN COOLER IS PROVIDED TO COOL TURBINE, GENERATOR LUBE OIL AND HYDRAULIC OIL. THE COOLER IS MOUNTED ON THE AUXILIARY TRAILER AND THE REST OF THE LUBE OIL SYSTEMS ARE MOUNTED ON THE MAIN TRAILER. BUYER MUST PROVIDE ANY ADDITIONAL CONTAINMENT PER LOCAL CODES AND STANDARDS.
SWITCHGEAR
THE EQUIPMENT PACKAGE IS SUPPLIED WITH A 3 SECTION NEMA 3R SWITCHGEAR ENCLOSURE. THE SWITCHGEAR INCLUDES A SET OF GENERATOR CIRCUIT BREAKER EQUIPMENT, 2 SETS OF INCOMING LINE VOLTAGE MONITORING EQUIPMENT, A MARSHALING CABINET AND A SET OF SWITCHGEAR ACCESSORIES. PERMANENT CABLE TERMINATIONS FROM THE NEUTRAL AND LINE-SIDE OF THE GENERATOR ARE ALSO INCLUDED.
1.2 AUXILIARY TRAILER
THE AUXILIARY TRAILER IS APPROXIMATELY 48’ (14600mm) LONG AND 8’-6” (2600mm) WIDE AND WEIGHS APPROXIMATELY 62,000 POUNDS (28,122 KG) FULLY LOADED. THE TRAILER IS PROVIDED WITH A TANDEM AIR RIDE SUSPENSION AND INCLUDES THE EQUIPMENT LISTED BELOW. FOUR LANDING LEGS ARE PROVIDED TO SUPPORT AND LEVEL THE TRAILER AT SITE.
AUXILIARY TRAILER SKID
THE AUXILIARY TRAILER SKID INCLUDES FUEL AND WATER INJECTION SYSTEM COMPONENTS NOT MOUNTED ON THE MAIN TRAILER. THE PUMPS, FILTERS AND NECESSARY INSTRUMENTATION ARE CONNECTED TO THE MAIN TRAILER COMPONENTS AT SITE WITH INTERCONNECT HOSES. THE AUXILIARY TRAILER SKID ALSO INCLUDES THE HYDRAULIC START SYSTEM AND WATER WASH SYSTEM DESCRIBED BELOW.
ELECTRO-HYDRAULIC START SYSTEM
THE EQUIPMENT PACKAGE IS SUPPLIED WITH A HYDRAULIC STARTING SYSTEM, WHICH INCLUDES AN ELECTRIC MOTOR DRIVEN HYDRAULIC PUMP ASSEMBLY, FILTERS, AND A FIN/FAN HEAT EXCHANGER MOUNTED ON THE AUXILIARY EQUIPMENT MODULE. A HYDRAULIC MOTOR IS ALSO MOUNTED ON THE GAS TURBINE ACCESSORY GEARBOX TO TURN THE GAS GENERATOR SHAFT. ALL PIPING AND FITTINGS ON THE BASE PLATES, PLUS HYDRAULIC CONNECTIONS BETWEEN THE AUXILIARY EQUIPMENT MODULE AND THE MAIN BASE PLATE ARE ALSO FURNISHED.
“OFF LINE” SOAK WASH SYSTEM
THE EQUIPMENT PACKAGE IS SUPPLIED WITH AN “OFF-LINE” CLEANING SYSTEM, WITH A WATER WASH RESERVOIR AND ALL NECESSARY FILTERS AND INSTRUMENTATION SUPPLIED. BUYER IS REQUIRED TO PROVIDE PURIFIED WATER TO THE STANDARDS LISTED IN THE WATER INJECTION SYSTEM.
FIRE PROTECTION SYSTEM
THE EQUIPMENT PACKAGE IS SUPPLIED WITH AN INSTALLED FIRE PROTECTION SYSTEM COMPLETE WITH HYDROCARBON SENSING AND THERMAL DETECTORS, PIPING AND NOZZLES IN THE ENGINE COMPARTMENT. THE FIRE PROTECTION SYSTEM INCLUDES CYLINDERS CONTAINING CO2 MOUNTED ON THE AUXILIARY TRAILER. AN INCLUDED 24 VDC BATTERY AND CHARGER POWERS THE FIRE PROTECTION SYSTEM (LOCATED IN THE CONTROL HOUSE.) ALL ALARMS AND SHUTDOWNS ARE ANNUNCIATED AT THE UNIT CONTROL PANEL. AN ALARM SOUNDS AT THE TURBINE IF THE GAS DETECTORS DETECT HIGH GAS LEVELS, OR IF THE SYSTEM IS PREPARING TO RELEASE THE CO2. WHEN ACTIVATED, THE PACKAGE SHUTS DOWN, AND THE PRIMARY CO2 CYLINDER IS DISCHARGED INTO THE TURBINE COMPARTMENT VIA MULTIPLE NOZZLES, AND THE VENTILATION DAMPERS AUTOMATICALLY CLOSE. AFTER A TIME DELAY AND IF REQUIRED, THE RESERVE SUPPLY OF CO2 IS DISCHARGED.
FIN FAN COOLER
THE EQUIPMENT PACKAGE IS SUPPLIED WITH A 100% REDUNDANT DUAL FAN, SINGLE CORE COOLER WITH SEPARATE COILS FOR THE TURBINE, GENERATOR LUBE OIL AND HYDRAULIC OIL. THE COOLER IS EQUIPPED WITH ALL INTERCONNECT PIPING AND INSTRUMENTATION NECESSARY FOR THE THREE CIRCUITS.
CONTROL HOUSE
THE BASIC EQUIPMENT PACKAGE IS SUPPLIED WITH A LIGHTED, INSULATED 22’ (6700mm) LONG BY 8’-6” (2600mm) WIDE CONTROL HOUSE. THE CONTROL HOUSE IS EQUIPPED WITH AN ACCESS DOOR, AIR CONDITIONER/HEATER, AND A HAND-HELD FIRE EXTINGUISHER. THE CONTROL HOUSE IS USED TO PACKAGE THE EQUIPMENT LISTED BELOW.
DIGITAL CONTROL SYSTEM
THE CONTROL SYSTEM FEATURES AN INTEGRATED ELECTRONIC FUEL MANAGEMENT SYSTEM WITH A PROGRAMMABLE SEQUENCER, VIBRATION MONITOR, FIRE SYSTEM MONITOR, DIGITAL METER, AND A DIGITAL GENERATOR PROTECTIVE RELAY MODULE. A DESKTOP OR LAPTOP PC WITH SEPARATE WORKSTATION AND CHAIR IS PROVIDED FOR HMI CONTROL. ALARM AND SHUTDOWN EVENTS ARE DISPLAYED ON THE HMI AUTOMATICALLY. A DEDICATED 24V DC BATTERY SYSTEM WITH POWER CHARGER IS INCLUDED IN THE CONTROL HOUSE.
GENERATOR PROTECTIVE RELAYS
THE EQUIPMENT PACKAGE IS SUPPLIED WITH TWO (2) INTEGRATED GENERATOR PROTECTION SYSTEM (IGPS) MICROPROCESSOR BASED RELAY MODULES, MOUNTED IN THE TURBINE CONTROL PANEL. ONE IGPS IS CONFIGURED FOR 50Hz AND ONE IGPS IS CONFIGURED FOR 60Hz. THE APPROPRIATE IGPS WILL BE SELECTED FOR USE AT SITE. THE IGPS INCLUDES ALL FUNCTIONS NECESSARY FOR PROTECTION OF THE GENERATOR.
UNIT MOTOR CONTROL CENTER
A FREESTANDING LINEUP OF MOTOR CONTROLS FOR ALL TM2500+ PACKAGE MOTORS IS SUPPLIED. THE MOTOR CONTROL CENTER IS INSTALLED IN THE CONTROL HOUSE AND ALSO INCLUDES A 45 KVA LIGHTING AND DISTRIBUTION TRANSFORMER.
BATTERY AND CHARGER SYSTEM
THE EQUIPMENT PACKAGE IS SUPPLIED WITH A 24 VDC NICAD BATTERY SYSTEM FOR CONTROL POWER AND FIRE SYSTEM AND CHARGER FOR EACH. IN ADDITION, A 125 VDC NICAD BATTERY SYSTEM WITH CHARGER IS SUPPLIED FOR THE GENERATOR LUBE PUMP. THE 125VDC BATTERY CHARGER HAS A SELECTOR SWITCH TO RECEIVE POWER FROM EITHER THE MCC OR AN EXTERNAL GENERATOR TO CHARGE THE BATTERIES. THE BATTERY SYSTEMS ARE FULLY WIRED AND MOUNTED IN RACKS AND ARE INSTALLED IN THE CONTROL HOUSE ALONG WITH THE WALL-MOUNTED CHARGERS.
1.3 GAS TURBINE AIR FILTER ASSEMBLY
THE AIR FILTER IS APPROXIMATELY 27’ (8200mm) LONG AND 10’-11” (3330mm) WIDE AND WEIGHS APPROXIMATELY 20,000 POUNDS (9072 KG) FULLY LOADED. THE AIR FILTER IS EQUIPPED WITH A TWO-STAGE FILTRATION SYSTEM FOR BOTH VENTILATION AND COMBUSTION AIR WITH PANEL TYPE PRE-FILTERS HOUSED IN HINGED DOORS AND HIGH EFFICIENCY BARRIER FILTERS. THE AIR FILTER INCLUDES WEATHER HOODS INSTALLED IN FRONT OF THE FILTRATION SYSTEM AND INLET SILENCERS. AN INLET PLENUM WITH HATCH IS PROVIDED FOR ACCESS TO THE FOO SCREEN FOR MAINTENANCE. VENTILATION FANS FOR THE TURBINE ENCLOSURE ARE INSTALLED IN THE AIR FILTER ASSEMBLY. TWO 50% FANS AND A BYPASS DAMPER ARE INSTALLED. ALL OF THE ITEMS LISTED ARE HOUSED IN THE FILTER HOUSE THAT IS COMPLETE WITH AN ACCESS DOOR FOR MAINTENANCE, SEPARATE AIR PATHS AND TURNING VANES AND THE NECESSARY INSTRUMENTATION. FOR CONNECTION TO THE MAIN TRAILER, THE AIR FILTER IS HARD MOUNTED DIRECTLY ON TOP OF THE COMBUSTION AND VENTILATION INLET PLENUM.
1.4 GAS TURBINE EXHAUST ASSEMBLY
THE EXHAUST IS APPROXIMATELY 17’ (5200mm) LONG AND 10’-3” (3100mm) WIDE AND WEIGHS APPROXIMATELY 20,000 POUNDS (9,072 KG) FULLY LOADED.
1.5 GROUNDING
EACH TRAILER IS SUPPLIED WITH GROUNDING PADS FOR INTER-CONNECTION BETWEEN EACH TRAILER TO A GROUNDING GRID. COMPLETING TRAILER-TO-TRAILER GROUND INTER-CONNECTION THE CONNECTIONS TO SITE GROUNDING GRID ARE NOT INCLUDED. THE GROUNDING GRID MUST BE COMPLIANT WITH THE GENERAL ELECTRIC “SPECIFICATION FOR GROUNDING OF MOBILE GENERATION UNIT.”
1.6 TM2500+ THE ORIGINAL DESIGN INFORMATION AMBIENT DESIGN LIMITS: 41°F (5°C) TO 122°F (50°C)
SEISMIC DESIGN CRITERIA (GTG PACKAGE): IBC 2009, SITE CLASS D, OCCUPANCY CATEGORY 111, SEISMIC DESIGN CATEGORY C, OCCUPANCY IMPORTANCE FACTOR 1.25, RESPONSE MODIFICATION FACTOR 2.5, SPECTRAL RESPONSE ACCELERATION: AT 0.2 SEC-G 0.48, SPECTRAL RESPONSE ACCELERATION: AT 1 SEC-Q 0.20, G LEVELS, BASE ACCELERATION= 0.24
MAXIMUM WIND SPEED (WIND LOAD): 75MPH
ROOF LIVE/ SNOW LOAD: 20 PSF
NEAR FIELD NOISE AT 3 FT. HORIZONTAL AND 5 FT. VERTICAL: 90 DB(A) ARITHMETIC AVERAGE
1.7 REMOTE MONITORING AND DIAGNOSTIC SERVICE CAPABILITY
MONITORING AND DIAGNOSTICS SERVICE HELPS PLANT OPERATORS IMPROVE THEIR AVAILABILITY, RELIABILITY, OPERATING PERFORMANCE, AND MAINTENANCE EFFECTIVENESS. 24X7 EQUIPMENT MONITORING OF KEY PARAMETERS BY FACTORY EXPERTS MAY LEAD TO EARLY WARNING OF EQUIPMENT PROBLEMS AND AVOIDANCE OF EXPENSIVE SECONDARY DAMAGE. DIAGNOSTIC PROGRAMS SEEK OUT EMERGING TRENDS ON THE EQUIPMENT; PROMPTING PROACTIVE COMMUNICATIONS TO AVOID FORCED OUTAGES AND EXTENDED DOWNTIME.
DURING THE WARRANTY PERIOD ONLY, THE PROACTIVE COMMUNICATION PROCESS INCLUDES A 24X7 CALL CENTER (KNOWN AS QUICK RESPONSE CENTER) CONSISTING OF HIGHLY SKILLED TECHNICAL REPRESENTATIVES WHO CAN IMMEDIATELY BEGIN ASSESSING AND DIAGNOSING AN EQUIPMENT PROBLEM ON THE PHONE. THESE TECHNICAL REPRESENTATIVES ARE TRAINED TO BE ABLE TO REMOTELY PROVIDE THE SAME HIGH LEVEL OF TROUBLESHOOTING SUPPORT THAT CUSTOMERS WOULD RECEIVE FROM AN ON-SITE CONTROLS TECHNICIAN. THE ABILITY FOR THE QUICK RESPONSE CENTER TEAM TO REMOTELY VIEW REAL-TIME OPERATING DATA VIA THE MONITORING & DIAGNOSTIC SERVICE ACCELERATES TROUBLESHOOTING OF THE EQUIPMENT. AS PART OF THE EXECUTION OF THE MONITORING AND DIAGNOSTIC SERVICE, BUYER WILL PROVIDE, IF REQUESTED BY SELLER, A HIGH-SPEED CONNECTION TO THE INTERNET AND IT SUPPORT IN THE CONFIGURATION OF THE VIRTUAL PRIVATE NETWORK (VPN) AS REQUIRED FOR INSTALLATION AND FOR CONNECTION TO SELLER’S REMOTE MONITORING CENTER DURING THE INSTALLATION, COMMISSIONING, AND WARRANTY PERIOD.
1.8 TRAINING
ONE “AERO PACKAGE OPERATIONS / FAMILIARIZATION” TRAINING CLASS AND ONE “AERO GAS TURBINE PACKAGE SYSTEM MAINTENANCE TRAINING CLASS EACH CONSISTING OF ONE-WEEK DURATION FOR TRAINING OF UP TO 15 OPERATORS.
1.9 PERFORMANCE TESTING
PERFORMANCE TESTING OF THE EQUIPMENT INCLUDING TWO MOBILIZATIONS FOR THE PERFORMANCE TESTING TEAM IS PROVIDED FOR UNDER PERFORMANCE TESTING SERVICES.
QUANTITY: 14 UNITS AVAILABLE
Robert Kohn | Click here to see contact details in the message |
Do you still have TM2500+ units available? Looking for 4 as well as BOP.
Adalberto Fernandez | Click here to see contact details in the message |
Please contact me, ASAP. I need three (3) units.
Harald Ford | Click here to see contact details in the message |
Ladies and Gentlemen,
please send us the technical documents, operating hours with service intervals, reliable photos of the condition o the equipment and your price expectations for all GE-TM2500 Trailer Units gas turbines listet on your website.
We would like to thank you in advance for your efforts and hope to receive a prompt reply.
With best regards
H. Ford
Dexter Adderley | Click here to see contact details in the message |
Please provide price.
mike clarkson | Click here to see contact details in the message |
We are interested in one to three. Please provide price per nit. Mike
Sudev c s | Click here to see contact details in the message |
Dear Sir,
I trust this message finds you well. Could you please let us know if your company has any surplus new/ used GE Speedtronic, GE Excitation, Bently Nevada, and Woodward control systems for sale? If you have any control system or its spare parts for sale let me know. We would be interested in making an offer.
Anis FOUNAS | Click here to see contact details in the message |
Hi ! I hope this email finds you well. My name is Anis FOUNAS, technical sales engineer from EMIGROUPE Company. We are currently working with a valued client who is in need of Fuel pumps for its GE TM2500+ turbines.
The original turbine is: MOOG -8014-1045
Let me know if you can provide these same pumps? If not, can you suggest me an equivalent solution ?
Best regards,
david dickert | Click here to see contact details in the message |
Looking for 4 units. please contact me with details.
Edward | Click here to see contact details in the message |
I am interested in these.
Please email me for contact.
edpersoonlijk@gmail.com
Or whatsapp 003123680068
Danial | Click here to see contact details in the message |
Hello,
How many units are currently available?
any indicative price guide?
thank you
Randall Dietrich | Click here to see contact details in the message |
Team, please send email if still requesting a quote. We can supply spare parts also.
Randall Dietrich | Click here to see contact details in the message |
Team, we have avilable 3 TM2500+ GEN6 units available.
Huang | Click here to see contact details in the message |
Dear Sir, We have 6 units frame 6B in good condition. inbox me if you are interested.
Natthapon Sreejansook | Click here to see contact details in the message |
Hello,
We interest on this unit. Please qoute us the price per unit.
Thank you
EDWIN OMAR ORTEZ | Click here to see contact details in the message |
buenas tardes,
Por favor nos indican si estan interesados en participar en una licitacion de suministro e instalacion y puesta en marcha de generadores de 30-35 MW 13.8KV que funcione con gas licuado de petroleo.
Agradecere su pronta respuesta.
Atte.,
Alex | Click here to see contact details in the message |
Dear Sirs,
I am interested in buying 6 Units, TM2500 ( 50 Hz, natural gas). Please provide us with a price, terms and conditions (YOM, warranty, etc.), if it is available.
Best regards, Alex
Haitham Brebish | Click here to see contact details in the message |
Ibwould like to know the price if It is still available?
James fletcher | Click here to see contact details in the message |
Hey
maher dergaa | Click here to see contact details in the message |
We are interested in this offer and we want to get the price of 5 units.
please contact us via email or WhatsApp: +216 21561228
Arshad | Click here to see contact details in the message |
Please submit your best technical and commercial proposal for supply, install and commissioning of trailer mounted 3 x TM2500 (60 Hz ) units with the following specs –
Edwin | Click here to see contact details in the message |
Can you give us an estimate of prices per unit and also a pack of 4 units? Best
Nikolas Saiter | Click here to see contact details in the message |
Good day my friend. We are looking for gas turbines with efficiency 39% or above. I have checked your offer and it seems like your equipment would work. The thing is we need a total of 100 MW. Can you supply? And how much it would cost us?
Janeric Acosta | Click here to see contact details in the message |
I would like to know the price of this equipment.
The GE TM2500 is a mobile gas turbine power plant manufactured by General Electric (GE) Power. The TM2500 is designed to provide quick-installation power generation in emergency situations or in remote locations where traditional power infrastructure is not available. It can be installed and commissioned in as little as 10 days, making it an ideal solution for emergency power, island power, and grid stabilization needs.
The TM2500 is powered by a GE LM2500 gas turbine, which is capable of producing up to 33 MW of electricity. The turbine is capable of running on a variety of gaseous fuels such as natural gas, propane, and diesel. It features GE's advanced aerodynamics and materials technologies, which help to improve efficiency and reduce emissions.
The TM2500 is a highly flexible power solution that can be used for a variety of applications, including power generation, peak shaving, and load balancing. It is also well suited for use in the oil and gas industry, mining and other industrial applications.
The GE TM2500+ Gen 6 Dual Fuel Turbine is a mobile gas turbine power plant manufactured by General Electric (GE) Power. It is an advanced version of the TM2500, which is designed to provide quick-installation power generation in emergency situations or in remote locations where traditional power infrastructure is not available. The TM2500+ Gen 6 is capable of generating up to 40MW of electricity and can run on both natural gas and liquid fuels, like diesel and heavy fuel oil.
The TM2500+ Gen 6 is equipped with GE's latest advanced aerodynamics and materials technologies, which help to improve efficiency and reduce emissions. The turbine is also equipped with GE's latest Dual Fuel technology which allows the turbine to run on both natural gas and liquid fuels, providing increased operational flexibility and fuel diversity.
The TM2500+ Gen 6 is a highly flexible power solution that can be used for a variety of applications, including power generation, peak shaving, and load balancing. It is also well suited for use in the oil and gas industry, mining, and other industrial applications. It features GE's advanced digital solutions, which provide real-time monitoring, control, and diagnostics, helping to improve the performance, reliability, and availability of the plant.
The GE TM2500+ GEN 6 Dual Fuel Turbine is a mobile gas turbine generator set designed and manufactured by General Electric (GE). It is a high-tech and efficient power generation system that can produce electricity from both natural gas and diesel fuel.
This turbine was first introduced in 2014 and is an upgrade to the previous model, the TM2500+ Gen 5. It has a power output of 25 megawatts (MW) when running on 50Hz and 30 MW when running on 60Hz.
The TM2500+ GEN 6 Dual Fuel Turbine is mainly used as a standby power source in various applications such as data centers, crypto mining, and emergency power. It is also used in the oil and gas industry for onshore and offshore operations, as well as in remote locations where grid power is unavailable or unreliable.
One of the advantages of this turbine is its mobility, which allows it to be quickly transported to different locations where power is needed. It also has a short start-up time, which means that it can start producing power within minutes of being turned on. Additionally, the TM2500+ GEN 6 Dual Fuel Turbine is designed to be fuel-efficient and emit low levels of emissions, making it an environmentally friendly option for power generation.
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X