Delivery PROMPT ALSO CONSIDER FOR BBHP
General
Classification ; ABS A1 CRC Derrick / Pipelay Barge
Flag / Port of Registry ; Hong Kong
Principal Dimensions and capacity
Length overall (LOA) 169m
Length between perpendiculars (LPP) 165m
Breadth (molded) 46m
Depth molded 13.5m
Operating Draft 7-9m
Scantling Draft 9m
Full Load Displacement 62,000MT
GRT 41,000
Ballast Capacity 34,673MT
Fuel Oil Capacity 4,038MT
Fresh Water 2,632MT
Structure Load in Main Dk Loading Area 10MT/m2
Other area 5MT/m2
On Pipe Laying Line Top Deck 5MT/m2
Generators
4 x Generators STX Korea MAN B&W 8L 27/38
Switchboard: SaierNico Electric Co.,Ltd made in China
Transformer: Haitian Electric Co.,Ltd
Mooring System
12 positional anchor winches driven by frequency conversion.
The positional anchor winches will be operated either locally or remotely at a centralized control station installed in the CCR.
The main performance parameters of the positional anchor winches as follows:
Diameter of galvanized wire rope:Φ76mm
Duty pull:1100kN (at mid layer)
Mooring speed:abt. 24m/min (at 1100kN)
Holding load: 3800kN (at 3RD layer)
Drum capacity:3000m
Crane
Barge is installed a 3000t (when at fixed) or 2000t (when at rotary) marine engineering hoister.
Hoist is driven by electric power supplied by generators.
Main claw completely rotary:
Safty working load x working radius 2000 mt @ 35m
Main deck jacking height when least working radius > 80m
Most working load hoisting speed 0 - 1.5 m/min
Part load hoisting speed 0 - 3 m/min
Main claw (no back line) fixed aft hoister:
Safty working load x working radius 3000 mt @ 30m
When 35 m working radius, deck hoisting hight > 80m
Most working load hoisting speed 1.5 - 3 m/min
Part load hoisting speed 0 - 3 m/min
Hook most entrance depth/ safty working load 5m/3000 mt
Auxiliary claw:
Safty working load x working radius 600 mt @ 60m
When least working radius , main deck hoisting height > 80m
Most load hoisting speed 0 - 10 m/min
Hook most entrance depth/safty working load 150m/600 mt
Deck Crane
Hydraulic and electric control : 50T28M/20T40M
Pipelaying System
Pipe Laying System Starboard mounted single joint S-lay system
Depth laying 300m
Capacity : 4" – 48" diameter pipe
Maximum external diameter 60 inch
Tensioner : 2 tensioners, 100 T each
Davits : Five (5) mounted with load cells at starboard stored on board ,capacity 30 t each
Price 180M USD net to owner.
We can guide you on all matter.
Dzullkifly Tufail | Click here to see contact details in the message |
Good day,
Dear Sir, Kindly please advise if you have the above DLB 3000 is available for SNP.
If available pls readvise us her location .
Thank you
Dzullkifly Tufail
Silvership Maritime Resources
Sugeng | Click here to see contact details in the message |
yours faithfully
We ask for an update on ship specification data, ship prices, methods of payment and ship permits.
Thank You
Sugeng
NB 3000T Derrick Pipe Laying Shallow Water Barge is a type of vessel designed for laying underwater pipelines in shallow water areas. It has a carrying capacity of 3000 metric tons and is equipped with a derrick, which is a type of crane used for lifting and lowering heavy loads.
The barge is designed to provide a stable platform for laying pipelines and is typically used for offshore oil and gas production. The derrick on the barge is used to handle the heavy pipes and equipment required for laying the pipelines.
Shallow water barges are commonly used in areas where the water depth is not deep enough to support larger vessels or where pipelines need to be installed in areas closer to the shore. They are typically used in oil and gas exploration and production, but can also be used for other types of underwater construction projects such as laying cables or installing wind turbines.
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X