1 Set - Siemens SGT 600 DLE,year:2011,Hours:553,Fuel:NG,10.5 KV ,50 Hz ,Dry Low Emission - Complete CCPP
Scope:Siemens turbine+gearbox+generator+HRSG+cooler+lube+Sound-Proof+control+Steam turbine+steam turbine generator+high volt cabinet+low volt cabinet+mcc+transformer
Total Power : 25+10 = 35 MW
Siemens GAS Turbine
Model:SGT600DLE
Dual Shafts
Emission type:DLE(Dry Low Emission)
Made in Sewden
Power Turbine speed:7759rpm
Equiv.Working hours:553
Number of start?52 times
Total Service time:374
Equiv Operating Cycles:58
Fuel:Dual(Natural Gas),
(Gearbox Ratio:5.172,speed:7759rpm down to 1500rpm,alternator speed:1500rpm )
Quantity of Shafts:Dual Shafts(may drive for compressor)
scope of supply:
1-High Pressure Compressor,2-Combustor,3-High Pressure PT,4-PT,
5-GearBox(Voith)?6-Alternator(ABB),7-Gas control part,8-Control room,9-Recovery Heat Boiler
10-Original manual book,11-Chimney,12-Transformer,13-Dryer,15-Fans,16-Airconditionr,17-Control boxes
18-Control computer,19-Cable,20-Lube system,20-some new spare parts
maintenance record:
a-The maintenance mainly involves passing hot air from the dryer to the combustion chamber. We have previously tried turning the dryer. Desiccant is placed inside the steam drum of the waste heat boiler.
b-The last run was in December 2017, and it was started every three months for about a year. Finally, we communicated with Siemens to adopt a long-term maintenance method, so we did not attempt to ignite again.
Price : USD 17,950,000 FOB Shanghai , China
Immediate Delivery