Subject: Two LM6000 PC SPRINT ( 60 HZ) - 2 EACH Low Hour REBUILT GE LM-6000 PC SPRINT


Date: 4/1/2024 11:45:18 AM

Details: Reviews 2

Dear All,

 

FOR SALE

 

2 EACH low hour REBUILT GE LM-6000 PC SPRINT

YOM 2002

Hours before over haul 27,000

Recent overhaul on Turbines 

Hours since overhaul approx. 2,000 

===========================================================

GAS TURBINE With Sprint Power Boost

FUEL:: GAS Fuel 

POWER OUTPUT: 47,300 KW @ ISO

MANUFACTURES GUARANTEED HEAT RATE OF - 8200 BTU/ kWh_

EMISSIONS GUARANTEE, WATER INJECTION:

NOx.....25ppmvd @ 15 % O2

GENERATOR: Brush 71.2 MVA, 60 HERTZ, 13.8 KV

COMPUTE WITH ALL NOTED Auxiliaries: (ATTACHED)

NEW LM6000 SPRINT GAS TURBINE GEN SET ::

I. SCOPE OF SUPPLY

For a detailed description of the basic and optional scope of supply please refer to the
accompanying Product Specification manual.

A. BASIC SCOPE OF SUPPLY

The following equipment and services are included in the basic scope of supply: 

· LM6000 gas turbine engine equipped with inlet bell mouth and screen.

  • GAS fuel, water injected combustion system, complete and self-contained on the unit, with connection on the baseplate for customer's filtered, regulated fuel supply at 625 psig ± 20 psig. 

· Generator, 13,800 Volt, 60 Hz, 3600 RPM. Low maintenance brushless excitation system suitable for Class I, Group D, Div 2 areas. Neutral and line cubicles with CTs, surge protectors and lightning arrestors.

· SPRINT (Spray Intercooling) power augmentation option.

· I-beam baseplates for turbine, generator and unit mounted accessories.

· Acoustic enclosure for gas turbine and generator. 

· Redundant ventilation systems and AC internal lighting.

· Multi stage air inlet filtration system for both gas turbine and generator, including 

weather hoods, inlet screen, pre-filter, final barrier filter, intake silencer, and 

standard ducting to plenum chamber. Filter house ladders and platforms are included.

· Electro-hydraulic start system.

· Separate oil systems for gas turbine and generator, including duplex filters, duplex water/oil coolers, stainless steel piping, and stainless-steel reservoirs.

· Unit control panel for indoor mounting in a controlled environment, including microprocessor fuel management and sequencing system, generator metering, Bentley Nevada vibration monitoring, CRT annunciation of alarms and shutdowns, and Ethernet/Modbus interface to customer’s DCS.

· I/O cubicle mounted on gas turbine enclosure.

· 24V DC control system battery with dual battery chargers.

· Fire and gas detection and extinguishing system, serving both turbine and generator compartments, 

· “Soak wash” system for simple cycle service.

· Generator factory testing to IEEE or IEC standards. Gas turbine performance test by : G.E.; full load string test and performance verification of turbine generator set at S&S factory (Houston). load string tested

· Six sets of drawing and data packages, O & M manuals.

See additional project specific details in “Scope of Supply” section. 

OPTIONAL EQUIPMENT AND SERVICES

(I) included in base price (S) Quoted separately

( ) Option H - Dual fuel system

( I ) Option I - Water injection metering system (NOx control with gaseous, liquid or dual fuel 

systems)

( I ) Option X – SPRINT (Spray Intercooling) power augmentation

(1) Exhaust stack

II. EXCLUSIONS

The items listed below are excluded from our offering. Any other equipment or services not described in the written proposal are also excluded.

- Fuel, fluids and chemicals

- Fuel storage tanks and forwarding equipment

- Water treatment and purification equipment

- Deaeration and chemical injection equipment

- Heat recovery boiler

- Boiler feed pump and auto level control assembly

- Automatic blowdown controls

- Absorption chiller and chilled water supply system

- Buildings, foundations and foundation embedment’s

- Filter house support structure other than standard

- High voltage transformer(s), switchgear and associated equipment

- Distributed plant control or remote-control panels

- Balance of plant and energy optimization controls

- Desuperheater equipment

- Steam turbine generator set

- Steam turbine condenser and condensate pumping equipment

- Cooling tower and circulating water system

- Interconnecting piping, conduit, and wiring between equipment modules

- Power plant calibration tools and ordinary hand tools

- Off loading of equipment at jobsite

- Yard light and fences

- Spare parts other than start-up spares

- Supervision or technical direction at jobsite

TERMS AND CONDITIONS OF SALE

This proposal is based on the following terms and conditions.

Inspection: Immediately

Purchase: Immediately

Delivery: IMMEDIATELY UPON PAYMENT.

Freight: EX. US Site 

Warranty: TBA

Fees : N/A

Seller Name: Released upon execution of all Confidentiality Agreements

Payment Terms

The following terms will secure the unit immediately:

Ö Letter of Intent

Ö Submission of Credit Facility 

Ö 20% Refundable Cash Deposit

Ö Balance due prior to REMOVAL.

 

 

Price is USD20.0 million each but buyer can make his offer 

 

Best regards

Woonha Jee

 

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

David Vega
Click here to see contact details in the message
9/19/2024 5:02:32 PM United States

where are the units located? are the units complete or are some other components needed.


Reply

Jim La Spina
Click here to see contact details in the message
5/23/2024 4:30:48 PM United States

We are looking for 2 X 50hz units for Asia, we would have to convert these packages that you have listed.


Reply

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X